East-West pipeline outlet (Yanbu loadings)
↓ = riskkb/d · IMF PortWatch Daily Ports (satellite AIS)
One of the 13 inputs to the composite score. This page shows the latest reading against its peacetime baseline, the recent history, and how much stress this indicator currently adds.
0.00 kb/d vs a normal ~960.0 — currently at 0% of normal.
Latest
0.00kb/d
2026-10-23 00:00 UTC
Normal
~960.0kb/d
registry baseline
7D trend
0%
flat · 7d
Observed min / max
0.00 – 9,560kb/d
trailing 180 days
Model stress
72/ 100
A move of one model span (730.0 kb/d) below the baseline corresponds to 66.7 stress. Stress rises toward 100 as conditions worsen; 100 is never reached.
History
trailing 180 daysAbout this indicator
Crude tanker loadings at Yanbu (King Fahd Port) — the Red Sea outlet of Saudi Arabia's East-West pipeline (Petroline, ~5M bpd capacity), the main crude bypass around Hormuz. Pipeline flows are not published, so the terminal IS the measurement: when Hormuz is constrained this ramps toward capacity (observed ~4.8 mb/d, Jun 2026); a collapse means the bypass itself is offline. Terminal-level proxy — also reacts to Red Sea shipping avoidance.
Source: IMF PortWatch Daily Ports (satellite AIS).
Model weight: 6% of the composite score.